---
title: "The tools to connect to Planitude: a guide to integrations"
description: "Planitude integrations: Jira, Azure DevOps, Slack, Teams, calendars, ChatGPT, Claude and Gemini via MCP, API and webhooks, .mpp and .xer files. Which to choose."
url: https://planitude.app/blog/planitude-integrations-guide
language: en
---

# The tools to connect to Planitude: a guide to integrations

Jira, Azure DevOps, Slack, Microsoft Teams, calendars, ChatGPT, Claude and Gemini, the API and webhooks, MS Project and Primavera files: what each integration does and which one fits your team.

by Planitude Team · Published October 2, 2026

A schedule loses its value the day it stops matching the real work. It happens when tasks live in a ticketing system, conversations in a chat tool and deadlines in a calendar, while the Gantt chart remains a separate document that someone updates by hand once a week.

Planitude integrations are designed to prevent that gap: the plan, with its dependencies, calendars and **critical path**, remains the source of dates, and the other tools receive or return the information they are responsible for. This guide presents them one by one and suggests which ones to turn on first.

> **Key takeaways**
>
> - **Software teams**: Jira Cloud and Azure DevOps Boards sync in both directions; the plan decides dates, the tracker decides status and assignee.
> - **Communication**: important updates reach a Slack or Microsoft Teams channel, deadlines arrive by email and in each person’s calendar.
> - **AI assistants**: ChatGPT, Claude and Gemini read and edit plans through the Planitude MCP server[^1], with OAuth and explicit permissions.
> - **Developers and files**: a REST API, signed webhooks and import of Microsoft Project and Primavera files.

## Why connect the plan to your team’s tools

A project plan answers a precise question: *when will we finish, and what could delay us?* Answering it takes dependencies, durations and calendars. Operational tools answer other questions: who is working on what, what is blocked, what has been discussed.

Connecting the two worlds brings three concrete benefits:

- **fewer manual updates**: progress comes from the tracker rather than from a status meeting;
- **delays surface earlier**: if a critical task slips, the team channel knows straight away;
- **one source for dates**: whoever plans does not have to chase dates changed in three different tools.

All integrations are available inside the project, from the **⋯ › Integrations** or **⋯ › Notifications** menu, and are described on the [Integrations](https://planitude.app/integrations) page.

## The available integrations at a glance

| Integration | What it does | Best for |
| --- | --- | --- |
| Jira Cloud | Tasks and issues synced both ways, dependencies as “Blocks” links | Software teams on Jira |
| Azure DevOps Boards | Tasks and work items synced both ways | Teams on Azure DevOps |
| Slack | Project updates in a channel, Monday summary | Teams that work in Slack |
| Microsoft Teams | Channel updates through a Workflow, a tab with the Gantt chart | Microsoft 365 organizations |
| Email and calendar | Deadline reminders and a private iCal link | Anyone with assigned tasks |
| ChatGPT, Claude, Gemini | Questions and edits on the plan through MCP | PMs and PMOs |
| API and webhooks | Read and write over REST, signed outgoing events | Developers |
| Files | Import of `.mpp`, `.mpt`, `.mpx`, XML, `.xer`; export to XML, CSV and PDF | Anyone moving from Microsoft Project or Primavera |

## Software development: Jira and Azure DevOps

Jira shows dependencies on the timeline with the “Blocks” link type and flags in red when two linked items overlap[^2], but recalculating dates from dependencies and the critical path are not among the features it describes. That is where a scheduling engine helps: Planitude calculates the dates, Jira remains the tool where the team works.

The **Jira Cloud** sync creates an issue for each task (or imports existing issues), turns finish-to-start dependencies into “Blocks” links and applies a clear rule: Planitude owns name, notes, dates and dependencies; Jira owns status and assignee. The details are in the article [Gantt and Jira](https://planitude.app/blog/gantt-jira-sync).

The **Azure DevOps Boards** integration follows the same model: sign-in with Microsoft Entra ID or a Personal Access Token, the work item type detected from the process (User Story, Product Backlog Item, Issue or Requirement), dependencies as Successor/Predecessor links, and no automatic deletion on either side.

## Communication: Slack, Microsoft Teams, email and calendars

Channel notifications are designed not to become noise. Only the events that matter are posted: completed tasks, date changes on critical tasks and milestones, new assignments, tomorrow’s deadlines and overdue tasks. Updates that arrive close together are grouped into a single message and, if you turn it on, every Monday morning the channel receives a summary of progress against the plan.

On **Slack**, the *Add to Slack* button and a channel choice are enough. On **Microsoft Teams** you use a channel Workflow: Microsoft switched off Office 365 connectors between 18 and 22 May 2026 and points to Workflows as the replacement[^3]. Teams also offers a read-only tab with the project’s Gantt chart. The full setup is in the article [Project notifications in Microsoft Teams and Slack](https://planitude.app/blog/teams-slack-project-notifications).

For individuals there are two simpler channels: the **morning email** with upcoming and overdue deadlines, sent only to people who have something due, and the **synced calendar**, a private iCal link to add to Google Calendar, Outlook or Apple Calendar, covering all projects or just one.

## AI assistants: ChatGPT, Claude and Gemini with MCP

The Model Context Protocol is an open standard for connecting AI applications to external systems[^1]. Planitude exposes an MCP server with tools to read projects, analyze the critical path and float, estimate the impact of a delay, run a Monte Carlo simulation and create or edit plans with a preview.

ChatGPT, Claude.ai and Gemini connect with OAuth: you enter the server address, sign in to Planitude and choose whether to allow changes as well. In Gemini, custom apps are currently available only to personal Google accounts of adults in the United States[^5]. Claude Code, Codex, Gemini CLI, Cursor and VS Code also work with an API key. The complete guide is in [Using ChatGPT, Claude and Gemini on your project plans](https://planitude.app/blog/chatgpt-claude-gemini-mcp-project-plans).

## Developers and automation: API and webhooks

For internal systems there is a **REST API** documented in OpenAPI 3.1, with keys created from your profile and read-only or read-and-write permissions. **Outgoing webhooks** send events such as tasks created, completed or rescheduled, projects created, comments and saved baselines: every delivery is signed, failed attempts are retried at increasing intervals, and an endpoint that keeps failing is disabled with an email notice. The documentation is on the [Developers](https://planitude.app/developers) page.

## Files: Microsoft Project and Primavera

Not every integration goes through an API. Many plans arrive as files: Planitude imports Microsoft Project `.mpp` files and `.mpt` templates, `.mpx`, Project XML, Primavera `.xer` and PMXML, with tasks, links, constraints, calendars and baselines. Project desktop can still save projects as `.mpp` or XML[^4]. On the way out, every project can be exported to Microsoft Project XML, CSV or PDF. If you are coming from Project Online, see the guide [Migrating from Project Online to Planitude](https://planitude.app/blog/migrate-from-project-online).

## Which one to choose for your team

- **Software teams on Jira or Azure DevOps**: start with the two-way sync, then add a Slack or Teams channel for delays on critical tasks.
- **PMOs and managers of several projects**: connect an AI assistant through MCP for questions such as “which projects are at risk this week?” and turn on the Monday summary.
- **Construction, events, implementations**: email reminders and the synced calendar are enough for assigned people; a Teams or Slack channel for the coordination group.
- **Internal systems and reporting**: the API and webhooks, with a read-only key when no changes are needed.
- **Migration from Microsoft Project or Primavera**: import the files, check the critical path and save a baseline right away.

## Coming soon

Integrations with **Zapier**, **Make** and **n8n**, built on the same API and webhooks, are in preparation, along with a **PowerPoint** add-in that places a project’s Gantt chart on a slide and keeps it up to date. News is announced on the [Integrations](https://planitude.app/integrations) page.

**Try Planitude with your own plan** [Create a free account](https://planitude.app/signup)

## Frequently asked questions

### Do integrations cost extra?

No. Planitude is free, supported by advertising, and integrations are included with no per-user licenses. The details are on the [Pricing](https://planitude.app/pricing) page.

### Who can turn on an integration for a project?

The owner and anyone with the edit role. People with read-only access can see the integration status but cannot connect or change it.

### Can I use Jira and a Slack channel on the same project?

Yes. Integrations are independent: a project can sync with Jira and post updates to a Slack or Teams channel at the same time.

### What happens to my data when I disconnect an integration?

The credentials are deleted. Planitude tasks do not change, and the data already in the external tool, such as issues or messages, stays where it is.

## Sources

Every fact about the products mentioned comes from these official pages, checked in September 2026. Prices are list prices, in the currency and billing period shown by the vendor, and may change.

[^1]: [Model Context Protocol: What is MCP?](https://modelcontextprotocol.io/docs/getting-started/intro)
[^2]: [Atlassian Support: dependencies on the timeline](https://support.atlassian.com/jira-software-cloud/docs/manage-dependencies-between-epics-on-the-timeline/)
[^3]: [Microsoft 365 Developer Blog: retirement of Office 365 connectors in Teams](https://devblogs.microsoft.com/microsoft365dev/retirement-of-office-365-connectors-within-microsoft-teams/)
[^4]: [Microsoft Support: save a project file](https://support.microsoft.com/en-us/office/save-a-project-file-in-project-desktop-fbeb7c8f-ce24-4cc0-a261-b27e4499c67c)
[^5]: [Google: connect and manage custom apps for Gemini Apps](https://support.google.com/gemini/answer/17209137)

## Try Planitude with your own plan

Create a free account, import your .mpp file or start from a template: within minutes you will see the Gantt chart with dependencies, calendars and the critical path.

[Create a free account](https://planitude.app/signup)
