Cookie policy

Last updated October 21, 2026

Three groups: what the site needs to work, Google Analytics statistics, and advertising. You can refuse analytics and advertising with one click.

Strictly necessary

Your sign-in session, a security token against cross-site requests, and the language cookie GANTIFY_LOCALE. Without these the site cannot work, so they do not ask for consent. Cloudflare, which protects the site, may set technical cookies that are strictly necessary for security (e.g. __cf_bm, to recognise automated traffic); they are not used to profile you.

Analytics (Google Analytics 4)

Only after you accept, Google Analytics 4 (Google Ireland Limited) sets _ga, which tells one browser from another, and _ga_*, which keeps the session state, both for 2 years; our technical cookie GANTIFY_GA_CONSENT, which lasts until you close the browser, tells our server that analytics is allowed. Purpose: statistics on how the site is used. Legal basis: your consent. GA4 does not store IP addresses. Without consent none of these cookies is set and Google only receives cookieless signals with no identifiers. Transfers and safeguards are described in the privacy policy.

Advertising cookies

Placed by the advertising network only after you accept. Until then no advertising script is loaded: the reserved ad space is drawn empty by our own code.

Where your answer is stored

In the GANTIFY_CONSENT cookie, for one year. It holds one word — accepted or rejected — and applies to both analytics and advertising.

No hidden tracking

Google Analytics is the only third-party analytics tool, and we use it without advertising signals or profiling: no email address, name or project content reaches Google. Page counts we keep for ourselves are aggregated and not tied to your account.

Changing your mind

Use the buttons below whenever you want. Rejecting stops analytics cookies immediately and blocks the advertising scripts from the next page load onwards; any _ga cookies already set can be deleted in your browser settings.

Browser controls

You can also block or delete cookies in your browser settings. Removing the necessary ones simply means signing in again.

Contact

Questions about this page: info@planitude.app

Change your choice

Your current choice: no choice made yet

Advertising keeps Planitude free