Documentation
REST API: quickstart and reference
API key authentication, rate limits, pagination and the OpenAPI 3.1 reference.
Automation and developers
Projects, tasks, assignments and dependencies through a REST API, with scoped API keys and an OpenAPI 3.1 reference.
What it does
For everything that does not have a ready-made integration: a signed event as soon as something changes, and an API to read and write the plan.
From Planitude to Your system
Both ways
Setup
In Profile → API keys, read-only or read and write, optionally limited to one workspace and with an expiry date.
On one project or on a whole workspace, choosing among 14 events: tasks created, completed or moved, dependencies, baselines, comments and more.
Verify the HMAC-SHA256 signature of each event and call the REST API documented in OpenAPI 3.1.
Documentation
API key authentication, rate limits, pagination and the OpenAPI 3.1 reference.
Documentation
Event catalog, HMAC-SHA256 signature verification and delivery with retries.
Guide
Planitude integrations: Jira, Azure DevOps, Slack, Teams, calendars, ChatGPT, Claude and Gemini via MCP, API and webhooks, .mpp and .xer files. Which to choose.
Every request carries a header with a timestamp and the HMAC-SHA256 signature of the body: recompute it with the webhook secret and reject requests that are too old. The developer documentation has ready-made examples.
No. API keys and connected apps can read and, with write access, create and update, but deleting projects and tasks stays in the web app.
No. Every integration is included in Planitude, which is free. You only need your own access to the other tool (for example a Jira, Slack or Microsoft 365 account) under its own terms.
From the app's page in the project, with Disconnect, at any time. Nothing is deleted: tasks stay in Planitude, issues and messages stay in the other tool. Connected AI apps are revoked from Profile → API keys.
The trademarks mentioned (Jira, Azure DevOps, Slack, Telegram, Microsoft Teams, Microsoft Outlook, Microsoft PowerPoint, Microsoft Project, Microsoft Power BI, Microsoft Excel, Visual Studio Code, Google Calendar, Gemini, Apple Calendar, ChatGPT, Codex, Claude, Cursor, Zapier, Make, n8n, Primavera) belong to their respective owners; Planitude is not affiliated with or endorsed by them.
Advertising keeps Planitude free