Documentation
OData feed: address, tables and options
Authentication, the six tables, $select, $filter, $orderby, paging and limits.
Files
Load tasks, milestones and assignments into Excel from a read-only OData feed and refresh them in one click, with no CSV to download each time.
What it does
An OData feed in read-only mode: Power BI and Excel load your plans as tables and refresh them when you want, with no file to export.
From Planitude to Microsoft Excel
Setup
In the project, open Export › Power BI / Excel: copy the URL of the project or of every project you can see in the workspace.
One click creates a personal key that can only read, limited to the workspace and valid for one year. It is shown once: you can revoke it in Profile › API keys.
In Power BI choose Get data › OData feed, in Excel Data › Get Data › From Other Sources › From OData Feed. Paste the URL, choose Basic with the key as password, select the tables and load them.
Documentation
Authentication, the six tables, $select, $filter, $orderby, paging and limits.
The data follows the plan every time you refresh. In Excel you can refresh on open or at intervals; in the Power BI service you can schedule refreshes with the same key.
Yes. It is a standard OData v4 feed, with its $metadata: any client that reads OData can use it. The technical details are in the developer documentation.
No. Every integration is included in Planitude, which is free. You only need your own access to the other tool (for example a Jira, Slack or Microsoft 365 account) under its own terms.
From the app's page in the project, with Disconnect, at any time. Nothing is deleted: tasks stay in Planitude, issues and messages stay in the other tool. Connected AI apps are revoked from Profile → API keys.
The trademarks mentioned (Jira, Azure DevOps, Slack, Telegram, Microsoft Teams, Microsoft Outlook, Microsoft PowerPoint, Microsoft Project, Microsoft Power BI, Microsoft Excel, Visual Studio Code, Google Calendar, Gemini, Apple Calendar, ChatGPT, Codex, Claude, Cursor, Zapier, Make, n8n, Primavera) belong to their respective owners; Planitude is not affiliated with or endorsed by them. Power BI and Excel are trademarks of Microsoft Corporation. Planitude is not affiliated with Microsoft.
Advertising keeps Planitude free